Your data (download or delete everything this company saved)
Download gives one file with every project and version your company saved, exactly as saved. Delete removes all of it for good; it cannot be undone, so download first. To confirm a delete, type your company name exactly as shown below.
Saved projects on this computer (versions and what changed)
Projects are kept in one file on this computer (data/epc_projects.sqlite3). Every save adds a new numbered version with your note; an older version is never changed, and nothing is ever deleted (Hide only removes a project from the list). Back up the data folder like any other file.
No saved project is open: the next save creates a new project.
Saved projects
Versions
Draft activities from a description (local AI)
Write a few sentences about the work. An AI model running on THIS computer proposes draft activities and questions. It can misread, skip a step or invent a duration, so check every line; it never gives dates (dates come from the schedule calculation). Nothing goes into the project until you press Add.
Draft activities (not yet in the project)
Questions the AI thinks you should answer
Lines the checks refused
Read a contract (plain text) and answer its questions
The reader only finds and quotes: it can miss a clause or pick the wrong sentence, so confirm every item against the original contract. Nothing goes into the project until you press the last button. You can open a .txt, .pdf or .docx file, or paste text. A scanned PDF (a picture of pages) cannot be read.
Dates found
Choose which date is the project start and which is the contract finish. Dates marked "guess" were written like 05/06/2027 and read as day/month/year.
Periods, damages, milestones and other terms
Questions to confirm (type your answer, or leave blank to keep it as an open question)
Edit the activities in a table
Change the table, then press Apply table changes. The project description on the left is updated and the schedule is recalculated. Predecessors are written like A10 or C110 SS+4 (types FS, SS, FF, SF; a minus lag is a lead); separate several with commas.
The schedule was not calculated
No schedule yet
Choose an example or open your own project file, then press Calculate schedule.
- Start
- Calculated finish
- Contract finish
- Duration
- Weather allowance
Dates on this page are calculated by this program. They have not yet been compared with a Primavera schedule, so check them with a planner before relying on them.
Working weeks used
Holiday lists
Holidays inside this schedule
Seasons and weather
Warnings about the calendar
The schedule above assumes crews and equipment are always available. Press the button to find a plan that keeps every limited resource (a crane, a crew) within its limit. The plan only ever DELAYS activities; it never moves one earlier. Resources are held from the first to the last day of an activity, including days off. The result is a proposal for the planner: nothing is written into the project unless you press the second button.
Activities that start later because of the limits
Use of each resource
Checks the finished schedule against written safety rules, for example no welding while painting. It does not know what is dangerous on your site: the rules and the tags on the activities come from the planner. "No clash" only means no clash among the activities that carry a tag. Nothing changes in the project unless you press a button below.
Clashes
Rules checked
Activities whose tags were only guessed from their names
A guess can be wrong in both directions. "Confirm" writes the tags into the project as the planner's own tags. "Not a hazard" writes an empty tag list, which switches guessing off for that activity.